01
Office and professional
Suite build-outs, spec suites, lobby and restroom upgrades, demising walls.
Scheduled around lease commencement; after-hours work for occupied floors.
An occupied clinic, a franchise restaurant and a metal warehouse need different schedules, inspections and trades. Here is what we build in each and what we plan for.
01
Suite build-outs, spec suites, lobby and restroom upgrades, demising walls.
Scheduled around lease commencement; after-hours work for occupied floors.
02
PEMB shells, office fit-out within warehouses, dock additions, slab replacement.
Steel and switchgear priced early given current tariffs and lead times.
03
Storefronts, white-box and brand build-outs, grease interceptors, hood and make-up air.
Coordination with landlord work letters and franchise prototypes.
04
Exam and operatory rooms, sterilization rooms, med gas and nurse call coordination.
Infection-control barriers when work is next to open practices.
05
Fellowship halls, accessibility upgrades, entries, roof and envelope work.
Phasing around services and events; building committee reporting.
06
Amenity spaces, leasing offices, corridors and parking-garage repairs for buildings over four units.
Work sequenced to keep residents' access open.
Published US benchmarks from September 2026, per square foot of hard cost. Regional factors can move these 25–50% either way, and soft costs such as design, permits and financing usually add 15–30% on top. We use them only as a starting point before pricing your drawings.
| Building type | Hard cost / SF |
|---|---|
| PEMB warehouse shell | $14–30 |
| PEMB warehouse, fully built out | $50–100+ |
| Dry warehouse | $55–175 |
| Cold storage | $130–350+ |
| Medical | $200–1,000+ |
Source: Terrapin Construction Group commercial cost guide, September 2026.